Meok Bs7121 Mcp

csoai-org/meok-bs7121-mcp

Built for UK crane and hiab operators who need to prove BS 7121 compliance before the lift happens, not after the incident. Ten tools cover the enforcement wedge: clause lookup across parts 1/3/4/5/7, lift category classification that triggers Appointed Person signoff, CPA Contract Lift versus Hire triage (the contractual split that decides who pays when things go wrong), ground bearing pressure calculations, exclusion zone validation, LOLER thorough examination scheduling, and CPCS card verification. Connects to the regulations HSE actually prosecutes on: LOLER 1998, PUWER, CDM 2015, and CAA airspace notifications under CAP 1096. Reach for this when you're quoting a job and need to know if you're hiring out kit or planning the entire lift, or when your Principal Contractor asks for an audit pack before you roll on site.

tools
10
transport
STDIO
last updated
Aug 19, 2026

Tools

10 tools

Public tool metadata for what this MCP can expose to an agent.

lookup_bs7121_clauseQuick clause lookup across parts 1/3/4/5/7

Quick clause lookup across parts 1/3/4/5/7

No parameter schema in public metadata yet.

classify_lift_categorybasic / standard / complex / critical — AP signoff trigger

basic / standard / complex / critical — AP signoff trigger

No parameter schema in public metadata yet.

triage_cpa_hire_vs_contract_liftThe £100k+ wedge — Baldwins v Vision style

The £100k+ wedge — Baldwins v Vision style

No parameter schema in public metadata yet.

check_ap_competenceA88 card + qualifications + experience

A88 card + qualifications + experience

No parameter schema in public metadata yet.

validate_lift_plan10-point Principal Contractor review

10-point Principal Contractor review

No parameter schema in public metadata yet.

calculate_ground_bearing_pressureOutrigger pressure vs soil safe bearing

Outrigger pressure vs soil safe bearing

No parameter schema in public metadata yet.

check_exclusion_zoneMinimum radius + barrier/signaller requirements

Minimum radius + barrier/signaller requirements

No parameter schema in public metadata yet.

schedule_loler_thorough_examLOLER Reg 9 cadence (6mo personnel / 12mo other)

LOLER Reg 9 cadence (6mo personnel / 12mo other)

No parameter schema in public metadata yet.

check_cpcs_cardA02/A36/A40/A60/A66/A73/A85/A88 verification

A02/A36/A40/A60/A66/A73/A85/A88 verification

No parameter schema in public metadata yet.

check_cap1096_aviationCAA §50 notification for cranes near aerodromes

CAA §50 notification for cranes near aerodromes

No parameter schema in public metadata yet.

Sponsors

Readme

MCP Scorecard: 90/100

meok-bs7121-mcp

BS 7121 lift-plan compliance for UK crane + hiab operators. Parts 1/3/4/5/7 clause lookup, AP competence, CPA Contract-Lift vs Hire triage, GBP calc, LOLER scheduling. By MEOK AI Labs.

Why this exists

BS 7121 is the UK lift-planning bible. Five parts most operators reference daily. Plus LOLER, PUWER, CDM 2015, CPCS. Mobile, tower, crawler, lorry-loader — every category has its own triage.

Real UK cases this MCP exists to prevent:

  • Brand Energy & Infrastructure Services UK — £1.6m HSE fine (Nov 2024). Jack Phillips (24) killed Eastbourne. Expired sling + missing exclusion zone.
  • Baldwins Crane Hire v Vision Modular Systems (ongoing 2026, £951k claim). CPA Condition 9(d) — proves Contract-Lift vs Hire triage at the QUOTE stage is the £100k+ wedge.

This MCP sits ABOVE 3D Lift Plan and Lolerflow — it doesn't simulate; it validates, classifies, and produces audit-quality compliance attestations.

Install

pip install meok-bs7121-mcp

View the full README on GitHub

Details

Repository
github.com/csoai-org/meok-bs7121-mcp
Package
meok-bs7121-mcp
Transport
STDIO
Registry
MCP registry, active

More from csoai-org