SSiertsema avatar

work-breakdown-structure

WBS from scope + deliverables. Enforces 100% rule, mutually exclusive siblings, deliverable-oriented nodes, 8/80-hour sizing, depth-by-need (3–5 levels). Decomposition axes (deliverable / phase / responsibility / hybrid) consistent within branches. WBS dictionary per node (description, deliverable, acceptance, size, deps, risks). Milestones distinct from work. Intra-WBS dependencies + coverage matrix. Anti-patterns flagged.

GitHub stars
2

Install

/plugin install work-breakdown-structure@svens-claude-plugins

Run it inside Claude Code after adding the marketplace with /plugin marketplace add SSiertsema/claude-code-plugins.

Sponsors

Details

Marketplace
SSiertsema/claude-code-plugins
Source
work-breakdown-structure
Category
Planning

More from SSiertsema/claude-code-plugins

All 182